Framing 2 unit in Thornbury

Not only did Mase Group oversee this project from commencement to lock up, the team also completed the frame on these intricate builds, consisting off large open voids, high pitched skylights, floor to ceiling windows with roof space hidden beams.

 


 
 
 

Framing 2 unit in Thornbury Footage

 
 
 

Framing of 7 units in Ascot Vale

This build saw Mase Group on one of the larger projects, on a busy intersection in the heart of Melbourne, with access issues and an elevated work area. These builds came together well and showed the heart and knowledge of the crew. Working on boundaries and with large fire safety requirements as part of the build.

 
 

Lock up and Fix of 4 Units in Maidstone

Mase Group were called in to follow the work of a framer where there had been many issues. The team did a great job on straightening walls and intersections that were an issue, as well as structurally strengthen items such as stairway walls as an important part of safety. Then it was onto tile underlay, fix, cladding, awnings, eaves and balconies.

 
 

Project Managing the Build of Dual Occupancy units in Coburg

Through a close partnership with AJ Construction Group, Mase Group was called into Project Manage the Build to Lock Up, with this being such an intercut and specific designer build, the team ended up involved with the project close to its completion. The Mae Group crew also completed Lock Up, Fix and various other works such as Decks, Cladding and Wall Panelling.

 
 
 
 

Project Managing the Build of Dual Occupancy units in Coburg Footage

 
 
 

Major Renovation in Richmond

A great project, a typical gem requiring an upgrade. From redoing walls and weatherboards, to reshaping the back end of the house with a major bathroom and laundry renovation, as well as a major deck overhaul. Mase Group also Project Managed this great little project.

 
 

Major Doctors Surgery Remodel in Werribee

From widening hallways, to re configuring room layouts. Mase Group created new rooms and waiting area, a full new reception area and counter, an automatic entrance door with deck ramped entry. New flooring throughout, carpet and vinyl, curved privacy rendered walls for patient viewing of designer Japanese gardens. UV treatment rooms, 2 bathroom remodel and upgrades, new doorways and large glass window pane walls. This clinic definitely left no stone unturned for a full overhaul that has seen it dramatically transform.

 

 

 

Indoor meets outdoor Renovation in St Kilda including large doorway creation, kitchen renovation and landscaping project

A long term client of Mase Group decided it was time to take their private residence to the next level. Starting with a kitchen overhaul, through to the bathroom, flooring and a breakout sliding stacker doorway that leads out to a raised outdoor tiled area and down to a designer landscaped area. A big Project managed by Mase Group with a heavy hands-on involvement across works.

 
 

Alfresco Living

Who doesn’t like a good Alfresco living space… that was the brief on this newly built home, from the construction dirt to a fully functional indoor meets outdoor space.

 
Mase Group - Construction & Maintenance Division

 

 
 
 

Alfresco Living Footage

 
 
 

Aged Care room remodeling and reconfiguration

Mase Group have been involved in the upgrading and reshaping of many resident rooms and common areas within aged care homes for a number of years all across Melbourne.


Pre Construction

Mid Construction

Post Construction

 
 

Aged Care room remodelling and reconfiguration Footage